Search
Your search has 5 results!
-
1. INVESTIGATING FDI INFLOWS IN ROMANIA THROUGH AN ARMA MODEL — 15 December 2014
Authors: • Oana - Cristina POPOVICI, CS PhD., email: popovici.oana@yahoo.com, Afiliation: Institute for Economic Forecasting • Adrian Cantemir CALIN, CS III PhD., email: cantemircalin@ipe.ro, Afiliation: Institute for Economic Forecasting • Mihaela SIMIONESCU, CS III PhD., email: mihaela_mb1@yahoo.com, Afiliation: Institute for Economic Forecasting
Abstract: In this paper, we study the relationship between GDP and FDI in Romania and we also assess the importance of GDP level for further attracting FDI. UsiNo 35 - September 2014 > INVESTIGATING FDI INFLOWS IN ROMANIA THROUGH AN ARMA MODEL
-
2. THE DAY-OF-THE-WEEK EFFECT ON BUCHAREST STOCK EXCHANGE — 23 December 2014
Authors: • Iulian PANAIT, PhD, email: iulian.panait@gmail.com, Afiliation: Hyperion University, Faculty of Economic Sciences • Carmen Marilena UZLAU, PhD, email: carmen_uzlau@yahoo.com, Afiliation: Hyperion University, Faculty of Economic Sciences • Corina Maria ENE, PhD, email: corina.maria.ene@gmail.com, Afiliation: Hyperion University, Faculty of Economic Sciences
Abstract: This study investigates the presence on Bucharest Stock Exchange of one of the most documented seasonal anomalies of financial assets’ returns:No 29 - March 2013 > THE DAY-OF-THE-WEEK EFFECT ON BUCHAREST STOCK EXCHANGE
-
3. REVİEW OF VARİANCE ANALYSİS İN UNİT PRİCE OR LUMP-SUM BASİS CONTRACTS FOR A CONSTRUCTİON PROJECT — 16 January 2015
Authors: • Ph.D. student and Project Manager of Pera Construction International, M.Sc.Civ.Eng. Hasan Bozkurt Nazilli, email: bozkurt.nazilli@yahoo.com, Afiliation: Technical University Of Civil Engineering Bucharest, Romania • Prof.Ph.D.M.Sc.Civ.Eng. Nicolae Postavaru, email: nicolae.postavaru@gmail.com, Afiliation: Technical University Of Civil Engineering Bucharest, Romania
Abstract: Project cost control became a critical issue for the construction projects under global recession. There are various methods for cost controlling accoNo 26 - June 2012 > REVİEW OF VARİANCE ANALYSİS İN UNİT PRİCE OR LUMP-SUM BASİS CONTRACTS FOR A CONSTRUCTİON PROJECT
-
4. OPTIMIZING THE PORTFOLIO OF ASSETS, ACCORDING TO THE MARKOWITZ MODEL — 16 January 2015
Authors: • Dan ARMEANU, Ph.D.Professor, email: darmeanu@yahoo.com, Afiliation: Academy of Economic Studies, Bucharest • Andreea NEGRU, Ph.D.Student, Afiliation: Academy of Economic Studies, Bucharest
Abstract: One can argue – with a degree of certainty – that finance experts had long realised that the decision to invest needed to take into accounNo 22 - June 2011 > OPTIMIZING THE PORTFOLIO OF ASSETS, ACCORDING TO THE MARKOWITZ MODEL
-
5. DYNAMIC ACTIVITY OF FOREIGN TOURISTS NATIONWIDE — 10 June 2015
Authors: • Cristina BURGHELEA, email: crystachy@yahoo.com, Afiliation: Hyperion University
Abstract: Study of the dynamics of tourism activity aims to identify prospects for growth in the number of overnight stays by foreign tourists in RomanNo 38 - June 2015 > DYNAMIC ACTIVITY OF FOREIGN TOURISTS NATIONWIDE